EarthWorks Geospatial Catalog

Planned Transitway Alignment

Description
This dataset depicts the planned alignments of future transitways which are in advanced design or under construction. Currently, this file includes alignments for Southwest LRT (Green Line Extension), Cedar Avenue BRT Phase 2 (Red Line), I-35W BRT (Orange Line), Bottineau LRT (Blue Line extension) and other planned Arterial BRT alignemnts. This file is markedly different from the Transitways2030 file which depicts all potential transitways in the Twin Cities Metro Area. (See http://datafinder.org/metadata/Transitways2030.htm) This file can be used at a large scale; however, these alignments are not a guarantee of actual completed alignment. File is for planning purposes only. Alignment is subject to change without warning. When transitway construction is completed and service begins, the alignment will move from this file to TransitwayAlignment (existing). Additional Notes: - Blue, Red and Orange line alignments are managed by Rachel Wiken (see Section 7). All other alignments are managed by: Katie Roth Senior Planner Metro Transit BRT/Small Starts Project Office 707 16th Avenue S Minneapolis, MN 55454 612-349-7772 katie.roth@metrotransit.org
Publisher
Metropolitan Council
Year
2014
Held by
Minnesota